Integrated end-of-line systems
A complete project approach that coordinates conveying, case packing, palletizing and stretch wrapping around one throughput and control concept.

Project scope
- Analysis of existing line outputs and bottlenecks
- Station layout and accumulation planning
- Mechanical, electrical, robot and PLC–HMI integration
Information for the initial assessment
We review product and packaging dimensions, weight, shift and peak throughput, existing layout, pallet patterns and control infrastructure. Capacity and configuration are defined by project assessment, rather than an assumed standard performance figure.
STU Servis for service and spare parts ↗
How we proceed
- Record requirements and the current situation.
- Assess scope, layout and implementation steps.
- Agree the proposal and acceptance criteria.
